undefined
Cooperation process

400 to inquire

Qualification Audit Headquarters Inspection Negotiation

Pay a deposit

Shop location assistance

Signing a contract

Design Drawings

Renovation and personnel training

Store acceptance

Raw material distribution

Marketing Planning

Opening and operation

Takeaway operation
combined
Make
Fang
Type

Requirements of engineering conditions
Store decoration requirements
A. Our company is responsible for the design of the store decoration; It can be decorated by the company or by itself, and evaluated and accepted by our company;
B the width of the billboard shall not be less than 2.5 meters and the height shall not be less than 0.9 meters; The bottom of the signboard shall not be less than 2.4 meters from the ground;
C. The electricity consumption shall not be less than 30 kW, and water access shall be required.
Store space requirements
A. the actual effective use area of the store shall not be less than 20 square meters, reaching the EIA unit standard;
B the net floor height of the store shall not be less than 2.5 meters; The net door width of the store shall not be less than 2.5 meters; The net depth of the store shall not be less than 3.5 meters;
Safety and health specification
A. Health standards and fire safety measures must meet the requirements of relevant departments;
B. All employees of the store must apply for health certificates.

Join advantage
Single speed material preparation chef requirements kitchen requirements investment threshold
Project Gross Profit Product Cycle Support System Cash register system.
In the future, Ge Pangjia will continue to make efforts to start the business plan to develop thousands of chain stores, to provide a relaxed entrepreneurial platform for all partners with entrepreneurial dreams, so that all partners can achieve themselves and win extraordinary lives!
Franchisee Display